
Cleaning tools are among the most frequently used household products — yet their design is often underestimated.
A well-designed dustpan and broom set must deliver efficiency, comfort, durability, and visual appeal, all while being produced at scale with consistent quality.
Today, manufacturers are upgrading traditional designs through 2K injection moulding, combining rigid structure with soft functional elements to create tools that truly improve the cleaning experience.
At YUEYI MOULD, we specialize in developing two-shot dustpan and broom set moulds that enable customers to achieve ergonomic design, superior cleaning performance, and stable high-volume production.
Mould cavities: 2 cavities
Mould injection system:
1st shot PP: 2 tips hot runner open gate
2nd shot TPE: 2 tips hot runner open gate
Cycle time: 50s
Injection machine:
300T injection machine
with additional injection unit from back side, 90 degree injection.
Mould cavities: 4 cavities
Mould injection system:
cold runner
Cycle time: 180s
Injection machine: 300T single color injection machine